CASE STUDY DETAILS
Lawe-Lawe (Lavilavi) SPM & Subsea Pipeline, Indonesia
- 2011–2013
- Indonesia
- Pertamina
- SPM + Subsea Pipeline Construction
Participated in the Lawe-Lawe SPM system and associated subsea pipeline project in Indonesia, completing SPM buoy installation, mooring layout, subsea hose connection and pipeline laying.
- SPM buoy offshore installation and CALM mooring
- Subsea hose and umbilical connection and testing
- Subsea pipeline laying and shore tie-in
- ROV / diver inspection support
- Large-scale SPM offshore installation experience



