Cabinda Offshore Import & Export System, Angola
- 2024–Present
- Angola
- Cabinda Gulf Oil Company / SONANGOL
- Pipeline EPC / Multi-Buoy Mooring / Bundle Tow Installation
Constructed the subsea import & export system for the Cabinda offshore terminal in Angola — a Multi-Buoy Mooring (MBM) system with associated subsea pipelines: 4 drum mooring buoys, 10" oil-import and 16" oil-export bundled pipelines, an 8" gas return line, PLEM manifold and onshore tie-in, installed by near-bottom tow. The project is still in execution.
- 4-buoy Multi-Buoy Mooring (MBM) system design, supply and offshore installation
- 10" oil-import + 16" oil-export bundled subsea pipelines — near-bottom tow transport and installation
- 8" gas return pipeline design, prefabrication and installation
- PLEM subsea manifold design, supply and installation
- Onshore pipeline tie-in, hydrotesting and commissioning support; Sonangol Local Content compliance